| Code | Courses Title | Venue | ST Date | EN Date | Price | Request | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| EL07 | Electrical Transformer Testing &Maintenance |
|
|||||||||||||||||||
| EL08 | Electric Power Equipment’s Test ( FAT&SAT). ( Generator, transformers, cable…etc.). |
|
|||||||||||||||||||
| EL12 | Transformer Testing & Maintenance |
|
|||||||||||||||||||
| EL16 | Electrical Distribution Systems |
|
|||||||||||||||||||
| EL20 | Cable Fault Location, Defects and Maintenance |
|
|||||||||||||||||||
| EL23 | Transmission and Distribution Lines (MV,HV,EHV &UHV) design, Transmission and Distribution Lines (MV,HV,EHV &UHV) design, protection and maintenance |
|
|||||||||||||||||||
| EL29 | Design and Testing HV Outdoor Equipments (CBS, CTS, VTS, CVTS, Disconnector, ETC.) |
|
|||||||||||||||||||
| MC01 | Rotating equipment failure, vibration & predictive maintenance |
|
|||||||||||||||||||
| MC03 | Gas Turbines Operation & Maintenance |
|
|||||||||||||||||||
| MC05 | Compressors Technology |
|
|||||||||||||||||||
| MC08 | Valves Technology |
|
|||||||||||||||||||
| MC12 | Mechanical Seal Technology |
|
|||||||||||||||||||
| MC18 | Alignment & Troubleshooting of Rotating Machinery |
|
|||||||||||||||||||
| MC23 | Air Conditioning Machine Operation |
|
|||||||||||||||||||
| MC30 | Compressors Maintenance & Troubleshooting |
|
|||||||||||||||||||
| MC32 | Boiler Operations |
|
|||||||||||||||||||
| MC37 | Process Plant Troubleshooting & Engineering Problem Solving |
|
|||||||||||||||||||
| MC39 | Process plant start-up, commissioning & troubleshooting |
|
|||||||||||||||||||
| IC01 | Instrumentation and Process Control |
|
|||||||||||||||||||
| IC05 | Static and Dynamic Measurement of Oil and Petroleum Products |
|
|||||||||||||||||||
| IC08 | Pipeline Control Room |
|
|||||||||||||||||||
| IC10 | SCADA |
|
|||||||||||||||||||
| IC12 | Distributed Control System (DCS) |
|
|||||||||||||||||||
| IC21 | Control Valves, Actuators and Positioners |
|
|||||||||||||||||||
| IC26 | Metering systems and Custody Transfer |
|
|||||||||||||||||||
| IC34 | Advanved Process Control |
|
|||||||||||||||||||
| IC38 | Tank Gauging Techniques |
|
|||||||||||||||||||
| IC51 | Programmable Logic Control (PLC) (Basics) |
|
|||||||||||||||||||
| IC52 | Programmable Logic Control (PLC) (Advanced) |
|
|||||||||||||||||||
| HSE01 | Accident & Insident Investigation |
|
|||||||||||||||||||
| HSE07 | HSE Management System |
|
|||||||||||||||||||
| HSE11 | Job Hazard Analysis |
|
|||||||||||||||||||
| HSE25 | Safety in Chemical Lab |
|
|||||||||||||||||||
| HSE28 | Advanced Fire fighting |
|
|||||||||||||||||||
| HSE32 | Hazards Identification and Risk Assessment |
|
|||||||||||||||||||
| HSE33 | Food Safety Supervisor |
|
|||||||||||||||||||
| HSE39 | HSE Documentation & office Management |
|
|||||||||||||||||||
| IS01 | Qualifying Industrial Security Staff |
|
|||||||||||||||||||
| IS09 | Qualifying Industrial Security Supervisors |
|
|||||||||||||||||||
| IS16 | Security Management & Planning |
|
|||||||||||||||||||
| IS24 | Security Crisis Emergency Management |
|
|||||||||||||||||||
| IS25 | Industrial Security Procedure in Petroleum Companies |
|
|||||||||||||||||||
| IS34 | CCTV |
|
|||||||||||||||||||
| IS35 | Security Skills for Reception Personnel |
|
|||||||||||||||||||
| IS36 | Corporate Security & Strategic Planning |
|
|||||||||||||||||||
| WT10 | Boiler Water Treatment Technology |
|
|||||||||||||||||||
| WT13 | Water Quality Laboratory |
|
|||||||||||||||||||
| WT18 | Water Technology in Oil and Gas Production |
|
|||||||||||||||||||
| WT22 | Chlorination System Operation |
|
|||||||||||||||||||
| WT29 | Wastewater Treatment Processes-Phosphorus and Nitrogen in Wastewater Treatment |
|
|||||||||||||||||||
| MS03 | Terminal Representative and Safe Loading of Bulk Carriers |
|
|||||||||||||||||||
| MS05 | Shipping, Terminal Operation and Chartering |
|
|||||||||||||||||||
| MS08 | Oil Movement and Tank farm Storage and Transportation |
|
|||||||||||||||||||
| MS18 | Shipping, Forwarding and Clearing Goods |
|
|||||||||||||||||||
| MS19 | Bulk Loading Operation |
|
|||||||||||||||||||
| MS20 | Liquefied Gas Handling Principles on Ships and in Terminals |
|
|||||||||||||||||||
| MS40 | Reclaimers Operation & Maintenance |
|
|||||||||||||||||||
| IT19 | SSRS Reporting System For PDMS |
|
|||||||||||||||||||
| IT34 | R12.x Oracle Purchasing Fundamentals |
|
|||||||||||||||||||
| IT39 | R12.x Oracle Advanced Supply Chain Planning Fundamentals |
|
|||||||||||||||||||
| IT42 | R12.x Inventory Management/Bill of Material & Engineering Accel |
|
|||||||||||||||||||
| IT45 | R12.x Oracle Warehouse Management Fundamentals |
|
|||||||||||||||||||
| IT55 | SharePoint 2013 Business Intelligence |
|
|||||||||||||||||||
| EL01 | Power system Protection |
|
|||||||||||||||||||